Success Stories From The Warehouse Floor

Cross-Dock Hub
A 3-level high-density system for fast-moving cross-docking operations in Salt Lake City, USA, handling 1,200 kg payloads at 180 pallets per hour. The system increases storage density by 40% and boosts efficiency by 30% compared with the legacy facility.
Explore more →
Distribution Center
Unicharm needed a Regional Distribution Center capable of consolidating several existing City DCs into one Shanghai hub, then redistributing efficiently across a large downstream RDC network fast enough to keep pace with E-Commerce order volume. This was the second system Rainbow Dynamics built for Unicharm.
Explore more →
E-Commerce
Manual picking was losing ground to order volume and SKU complexity. Bosch needed high bin-density storage, fast goods-to-person delivery at the workstation, and a system that would fit inside the existing facility footprint no full redesign. Vendor selection was competitive against Bosch's own quality bar.
Explore more →
Cold Storage
Equipment had to run reliably between -18°C and -25°C inside a 7.2m-height facility, manage 400+ SKUs, and hold consistent picking performance while manual fork truck work in sub-zero aisles was creating both safety and productivity problems.
Explore more →