Background
This Cross-Dock Hub cross-docking project is located in Salt Lake City, USA and uses a 3-level high-density system for fast-moving transit operations.

This Cross-Dock Hub cross-docking project is located in Salt Lake City, USA and uses a 3-level high-density system for fast-moving transit operations.
The project required a solution capable of supporting fast-moving cross-docking operations and the rapid handling of 1,200 kg payloads, while improving storage density and operational efficiency compared with the legacy facility.
An advanced 4D Shuttle solution was deployed with 13 4D Shuttle units, 3 lifts, and 13 charging stations, providing 618 pallet storage locations and a system performance of 180 pallets per hour. The system increases storage density by 40% and boosts efficiency by 30% compared with the legacy facility.
Storage density increase
Efficiency increase
System performance
Payload capacity